Nagavalli Village
Government Higher Primary School

Status: Construction started on March 12, 2018.

Location: Nagavalli Village, Chamarajanagara Taluk & district, Karnataka, India

No. of Students: 168

School Established in: 1858

Grades: 1 to 7

Total Cost of Project: 15.00 Lacs INR

OSAAT Contribution: Repair/refurbishing of three classrooms with tiled roof, waterproofing of the classrooms with RCC roof, repairing the existing boys’ toilet, construction of a new toilet block for girls, construction of wash area and providing water lines to toilets, kitchen.

Donate

We are proud to start this journey. We are grateful and optimistic that people will want to continue this domino effect, so we can do more.

Donate

Progress Timeline

  • Inspection : June 2015
  • Master Plan : Nov 2015
  • Contractor Awarded : Dec 2015
  • Construction Started : Jan 2016
  • Construction Ended : March 2017
  • Classrooms Handover : May 2017

Excerpts From RFP & Site Visit

Currently the infrastructure need is for 5 to 7th and this school is likely to house 8th in future as per the Rashtree Madhyamika Shikshana Neethi. Newly built classroom by Government is already leaking and not fit for students to sit. There are so many old broken structures that need to be demolished. Sump is in a place very far from Borewell and also far from kitchen. Kids pull water out of the sump by hand which is dangerous.

On inspecting the school, the engineer has suggested repairing the main building which has bad flooring and roofing (Mangalore tiles). Once fixed, 5 th to 7 th standard can be accommodated here. Fix the roof of the newly build classroom to make it waterproofing. With this the 1 st to 4 th standard classes can move into the new class rooms. 

The sump to be shifted close to kitchen and fix the water and toilet supply. We may also have to repair the existing toilet block for boys to make it work as the same has no proper drain facility because of which water is getting stagnant.

Total estimation for carrying out the above work is estimated at about Rs. 10.00 lakhs.

School management and Zilla panchayat has agreed to demolish the old blocks and clean it up. Also panchayat member has agreed to get the drinking water from the panchayat to the School premises.

Before OSAAT Intervention

  • The school presently has 10 classrooms, 1 staff room, 1 TV/computer room, 1 sports room and 1 kitchen block.
  • Out of 10 classrooms, 6 classrooms are in dilapidated condition.
  • The classrooms with mangalore tiled roof had broken tiles, damaged roof support, cracked walls, broken floor.
  • The classrooms with RCC roof were also not in good shape as they were leaking and crack in the walls.
  • The existing toilet was not functional as the same was not provided by drainage. The kitchen and toilet is not provided with water lines and children are seen ferrying water from a distance in buckets. There was no separate toilet for girls.

After OSAAT Intervention

  • Repairing of 3 classrooms with Mangalore tiled roof which include replacing the broken tiles, replacing the damaged wooden support structures, redoing the floor with kota stones, filling the cracks in the walls, repairing the damaged windows, providing electric supply and lighting and paining the refurbished class rooms.

  • Repairing the existing toilet by replacing the broken commodes, fixing the drainage lines, providing water lines etc.

  • Construction of wash area for children.

  • Fixing water lines to kitchen, toilet and wash area including fixing overhead tanks and submersible pump for the borewell.
  • Water proofing the classrooms with RCC roof which were leaking.