| School Location: | Chikkahunsur village, Hunsur taluk, Mysuru district, Karnataka |
| No. of Students: | 382 |
| Grades: | Classes 1 to 8 |
| Requirements: | The school had very good student strength. Classes 6, 7, 8 could be split into divisions. The school required 12 classrooms, an office room and staff room. The school had 8 classrooms and 3 small rooms, some of them in poor condition. The toilets were in poor condition. |
| OSAAT Proposal: | OSAAT constructed 4 new classrooms (2+2) and new toilet block. |
| Estimated Cost: | INR 50 lakhs (USD 70K). |
| Funding: | This project was funded by donors from the USA. |
| Status: | Construction started with the ground breaking ceremony held on 15-Aug-2021; completed with the inauguration of the new building on 10-Sep-2022. |
"*" indicates required fields